Contact Us
Dry Hip Fixing Pack x 6m Harcon UHS6/B
Item Code: UHS6/B,Universal Dry Hip

Dry Hip Fixing Pack x 6m Harcon UHS6/B

£ 67.73
(Inc £81.28)
The Universal Dry Hip System provides a mechanically fixed finish to the hip line without the use of mortar bedding and is full compatible with the Corovent URS Dry Ridge System. Hip Trays Not included.
Est. Delivery 2 - 3 Working Days
Order in the next Hours Mins and Seconds,
To get your item delivered on Monday
Universal Dry Hip

The Dry Hip Fixing System consists of 1 x Hip Roll (6m length), 10 x Dry Ridge Union Brackets and 13 x Dry Fix Unions Including Fixings and screws.

Hip Trays Not Included.

Features:
  • Quick and easy to install
  • No special tools required
  • Mortar free
  • UV stable
  • Water resistant
Manufacturer: Harcon Corovent
Product Code: UHS6/B

►Return to product list

Delivery Information


Delivery Charges

We offer a free standard delivery service on all orders over £500.00*. Orders under £500.00* will be charged a delivery fee. All delivery charges are calculated at basket and are dependent on the items ordered.

Our standard delivery area covers mainland England, Scotland (Excluding Highlands) and Wales. For all other areas around the UK an additional delivery charge will need to be applied, we will advise you of this charge before your order is dispatched. For deliveries to these areas we are happy to provide a free quotation upon request.

Free Delivery Exclusions

  • All Tapco Products
  • Roof Vents are not available for delivery to Ireland and Northern Ireland.

Mardome Rooflights

It is important to note that all Mardome rooflight orders are subject to a failed delivery charge in the event of unsuccessful delivery. This fee is £85 ex VAT and must be taken into account when making your purchase.

If you wish to return your order, please contact us. However, it is important to note that due to many Mardome rooflights being made to order, returns are only accepted in exceptional circumstances and a collection charge of £85 ex VAT will be applied if approved. We recommend taking the time to review your order carefully before making payment as this fee is non-refundable.

Should you have any queries regarding Mardome rooflights, please don't hesitate to contact us. Our team are dedicated to providing excellent customer service and will be more than happy to answer any questions you may have.


Delivery Dates and Times

We will always do our best to deliver stocked items ordered via our website within 3-5 working days. This applies to goods ordered before 12.00pm and in stock.

Please see estimated delivery times (Est. Delivery) on each product.


Roof Tile Vents

All the Roof Tile Vents and Cowls are made to order (due to thousands of combinations of different variants available) bespoke items which are non-returnable.
 


Other Information

Some of our products, because of their size (5m and over) and weight (over 80 kilos), have an estimated 5 to 7 working day lead time but we will endeavour to get them to you as soon as possible.

Maximum number of roof sheets available on one delivery is 40, otherwise a forklift is required please call for more information.

The Mardome Hi-Lights Range of Dome Rooflights have a 48 hour delivery schedule. Orders must be received by 1pm to qualify for the 48 hour (2 working days) delivery. Only available to mainland GB (excluding postcode areas begining KW, IV, AB, and PH).

We regret that timed deliveries cannot be given. Deliveries will be made between 8.00am and 5.30pm Monday to Friday.


Made to Order Item's (Bespoke Items)

Please note all made to order items are made are non-returnable.

Signing For Your Delivery

All deliveries should be signed for and we would politely request that you sign and clearly print your name so that in the unlikely event that there are any discrepancies we will have a person to contact. If a signature cannot be obtained we will try to leave the goods in a safe location, but we cannot be held responsible for shortages or damages where goods have not been signed for.

Accepting Your Goods

Large or palletised goods will be delivered to a hard standing area only. The Customer shall be solely responsible for the unloading of the Goods and the Seller shall not be liable for any damage that occurs in the course of such unloading.

Any shortages or damages must be reported within 48 hours.

Delivery Vehicle

If goods aren't sent by our own vehicles they are sent by reputable carriers such as Tufnell's, Fed-Ex and Parcel Force. Heavier goods may be delivered by larger vehicles and will be off loaded as close as possible to the property whilst remaining on a hard standing surface.

Good Advice

Please do not arrange any labour until your materials are on site as we are unable to compensate you for your time in the event of a late delivery.

If you have ANY questions about our products, or want to give us some feedback about your shopping experience with us, please feel free to contact us on 03302 230 267 or email: [email protected]

*excluding VAT

Harcon Dry Hip System Installation Guide

Stage 1.
To preparefor dry hip installation felt and batten the roof in the normal manner, ensuring that the tiles battens are securely fixed to the hip rafter or to noggins fixed to the side of the hip rafter.
Harcon Dry Hip Installation
Stage 2.
Two 25mm tile battens screwed (screws not supplied) through to the hip rafter in between the tile battens. Ensure that supports have been installed at the apex and at the eaves and regularly between the tile battens down the line of the hip.
Harcon Dry Hip Installation
Stage 3.
Fix the 50mm x 50mm hip battens down to the support using screwa (not supplied).
If two 25mm x 50mm tiling battend are used to build the hip batten then ensure that they are properly fixed together.
Harcon Dry Hip Installation
Stage 4.
Tile as normal ensuring tiles are neatly cut along the line of the hip batten and ensuring no cut tile edges are further than 30mm from the hip batten.
All small cut tiles should be well secured and checked before proceeding with dry hip installation.

Small tile cuts can be secured using tile ties provided. The clips are pushed on to the cut side of the tile and the wire tail secured to the tiling batten or the hip batten.

All cut tiles must be checked to ensure positioning before continuing with the installation.
Harcon Dry Hip Installation
Stage 5.
Take the hip roll and unroll from the eaves ensuring it is centrally positioned over the hip batten leaving 100mm extra at the top to cover the hip ridge apex.

Secure the hip roll in position using well spaced felt nails.
Harcon Dry Hip Installation
Avoid stretching the roll at any point during the installation. Where it is necessary to use more than one hip roll ensure the joints are overlapped by 100mm to enable water to drain from the roof.

Ensure all raking tiles are clean and dry before removing backing tape from the underside of the roll. Once the backing tape is removed push the hip roll firmly into the tiles either side of the hip batten. The roll should finish central over the hip batten and provide a continuous seal along the tiles.

Stage 6.
The hip support trays should be fitted from the bottom of the hip up. The first tray should be cut to suit the angle and overhang of the tiles at the eaves.

Nail the tray to the hip batten using fixing provided ensuring it is centrally located on the batten. Fix further trays on the hip ensuring that a 100mm lap is made on the tray below.

To enalbe two hips to meet at the ridge the trays should be mitred at the internal angle.

Stage 7.
Fix the block end hip tile using the screw and sealing washer supplied. Ensure that the fixing passes through the support tray and secures tightly into the hip batten to achieve a firm seal between the tile and fixing.
Harcon Dry Hip Installation
Stage 8.
The union clamps provided should be fitted centrally on the hip tiles. The base should be formed to the underside of the tile. The cap should be pushed securely into the base with both tiles properly located before fixing through with screw provided.
Harcon Dry Hip Installation
Stage 9.
Securely attach and fix the unions with each hip tile whilst working eaves to ridge. Ensure all tiles are properly secured and properly aligned.
When constructing the ridge consider that a full length hip tile must be used at the apex with any adjustment for the hip length to be made by trimming the adjacent hip tiles.
Once complete check all union clamps are securely screwed to the hip batten. The hip tiles should sit evenly on the support tray. The top apex hip and ridge tiles should be mitred to give a neat finish and set aside.
Harcon Dry Hip Installation
Stage 10.
An apex soaker shaped and trimmed to fit should be fitted to ensure a weather tight installation at the hip / ridge apex. (not supplied)
Fix the apex / ridge tile by drilling a 6mm diameter hole approximately 125mm down from the apex using a masonary drill and secure through the tile to the batten using a screw and sealing washer provided.
Harcon Dry Hip Installation
Universal Dry Hip

The Dry Hip Fixing System consists of 1 x Hip Roll (6m length), 10 x Dry Ridge Union Brackets and 13 x Dry Fix Unions Including Fixings and screws.

Hip Trays Not Included.

Features:
  • Quick and easy to install
  • No special tools required
  • Mortar free
  • UV stable
  • Water resistant
Manufacturer: Harcon Corovent
Product Code: UHS6/B

►Return to product list

Delivery Information


Delivery Charges

We offer a free standard delivery service on all orders over £500.00*. Orders under £500.00* will be charged a delivery fee. All delivery charges are calculated at basket and are dependent on the items ordered.

Our standard delivery area covers mainland England, Scotland (Excluding Highlands) and Wales. For all other areas around the UK an additional delivery charge will need to be applied, we will advise you of this charge before your order is dispatched. For deliveries to these areas we are happy to provide a free quotation upon request.

Free Delivery Exclusions

  • All Tapco Products
  • Roof Vents are not available for delivery to Ireland and Northern Ireland.

Mardome Rooflights

It is important to note that all Mardome rooflight orders are subject to a failed delivery charge in the event of unsuccessful delivery. This fee is £85 ex VAT and must be taken into account when making your purchase.

If you wish to return your order, please contact us. However, it is important to note that due to many Mardome rooflights being made to order, returns are only accepted in exceptional circumstances and a collection charge of £85 ex VAT will be applied if approved. We recommend taking the time to review your order carefully before making payment as this fee is non-refundable.

Should you have any queries regarding Mardome rooflights, please don't hesitate to contact us. Our team are dedicated to providing excellent customer service and will be more than happy to answer any questions you may have.


Delivery Dates and Times

We will always do our best to deliver stocked items ordered via our website within 3-5 working days. This applies to goods ordered before 12.00pm and in stock.

Please see estimated delivery times (Est. Delivery) on each product.


Roof Tile Vents

All the Roof Tile Vents and Cowls are made to order (due to thousands of combinations of different variants available) bespoke items which are non-returnable.
 


Other Information

Some of our products, because of their size (5m and over) and weight (over 80 kilos), have an estimated 5 to 7 working day lead time but we will endeavour to get them to you as soon as possible.

Maximum number of roof sheets available on one delivery is 40, otherwise a forklift is required please call for more information.

The Mardome Hi-Lights Range of Dome Rooflights have a 48 hour delivery schedule. Orders must be received by 1pm to qualify for the 48 hour (2 working days) delivery. Only available to mainland GB (excluding postcode areas begining KW, IV, AB, and PH).

We regret that timed deliveries cannot be given. Deliveries will be made between 8.00am and 5.30pm Monday to Friday.


Made to Order Item's (Bespoke Items)

Please note all made to order items are made are non-returnable.

Signing For Your Delivery

All deliveries should be signed for and we would politely request that you sign and clearly print your name so that in the unlikely event that there are any discrepancies we will have a person to contact. If a signature cannot be obtained we will try to leave the goods in a safe location, but we cannot be held responsible for shortages or damages where goods have not been signed for.

Accepting Your Goods

Large or palletised goods will be delivered to a hard standing area only. The Customer shall be solely responsible for the unloading of the Goods and the Seller shall not be liable for any damage that occurs in the course of such unloading.

Any shortages or damages must be reported within 48 hours.

Delivery Vehicle

If goods aren't sent by our own vehicles they are sent by reputable carriers such as Tufnell's, Fed-Ex and Parcel Force. Heavier goods may be delivered by larger vehicles and will be off loaded as close as possible to the property whilst remaining on a hard standing surface.

Good Advice

Please do not arrange any labour until your materials are on site as we are unable to compensate you for your time in the event of a late delivery.

If you have ANY questions about our products, or want to give us some feedback about your shopping experience with us, please feel free to contact us on 03302 230 267 or email: [email protected]

*excluding VAT

Harcon Dry Hip System Installation Guide

Stage 1.
To preparefor dry hip installation felt and batten the roof in the normal manner, ensuring that the tiles battens are securely fixed to the hip rafter or to noggins fixed to the side of the hip rafter.
Harcon Dry Hip Installation
Stage 2.
Two 25mm tile battens screwed (screws not supplied) through to the hip rafter in between the tile battens. Ensure that supports have been installed at the apex and at the eaves and regularly between the tile battens down the line of the hip.
Harcon Dry Hip Installation
Stage 3.
Fix the 50mm x 50mm hip battens down to the support using screwa (not supplied).
If two 25mm x 50mm tiling battend are used to build the hip batten then ensure that they are properly fixed together.
Harcon Dry Hip Installation
Stage 4.
Tile as normal ensuring tiles are neatly cut along the line of the hip batten and ensuring no cut tile edges are further than 30mm from the hip batten.
All small cut tiles should be well secured and checked before proceeding with dry hip installation.

Small tile cuts can be secured using tile ties provided. The clips are pushed on to the cut side of the tile and the wire tail secured to the tiling batten or the hip batten.

All cut tiles must be checked to ensure positioning before continuing with the installation.
Harcon Dry Hip Installation
Stage 5.
Take the hip roll and unroll from the eaves ensuring it is centrally positioned over the hip batten leaving 100mm extra at the top to cover the hip ridge apex.

Secure the hip roll in position using well spaced felt nails.
Harcon Dry Hip Installation
Avoid stretching the roll at any point during the installation. Where it is necessary to use more than one hip roll ensure the joints are overlapped by 100mm to enable water to drain from the roof.

Ensure all raking tiles are clean and dry before removing backing tape from the underside of the roll. Once the backing tape is removed push the hip roll firmly into the tiles either side of the hip batten. The roll should finish central over the hip batten and provide a continuous seal along the tiles.

Stage 6.
The hip support trays should be fitted from the bottom of the hip up. The first tray should be cut to suit the angle and overhang of the tiles at the eaves.

Nail the tray to the hip batten using fixing provided ensuring it is centrally located on the batten. Fix further trays on the hip ensuring that a 100mm lap is made on the tray below.

To enalbe two hips to meet at the ridge the trays should be mitred at the internal angle.

Stage 7.
Fix the block end hip tile using the screw and sealing washer supplied. Ensure that the fixing passes through the support tray and secures tightly into the hip batten to achieve a firm seal between the tile and fixing.
Harcon Dry Hip Installation
Stage 8.
The union clamps provided should be fitted centrally on the hip tiles. The base should be formed to the underside of the tile. The cap should be pushed securely into the base with both tiles properly located before fixing through with screw provided.
Harcon Dry Hip Installation
Stage 9.
Securely attach and fix the unions with each hip tile whilst working eaves to ridge. Ensure all tiles are properly secured and properly aligned.
When constructing the ridge consider that a full length hip tile must be used at the apex with any adjustment for the hip length to be made by trimming the adjacent hip tiles.
Once complete check all union clamps are securely screwed to the hip batten. The hip tiles should sit evenly on the support tray. The top apex hip and ridge tiles should be mitred to give a neat finish and set aside.
Harcon Dry Hip Installation
Stage 10.
An apex soaker shaped and trimmed to fit should be fitted to ensure a weather tight installation at the hip / ridge apex. (not supplied)
Fix the apex / ridge tile by drilling a 6mm diameter hole approximately 125mm down from the apex using a masonary drill and secure through the tile to the batten using a screw and sealing washer provided.
Harcon Dry Hip Installation
Customer Reviews (0)